First Pond of the week installed in Edinburgh by our Fully TWI Certified technicians. Materials used 1.5 HDPE Solmax deployed straight from the roll, on to the next pond in Glasgow. BGA, SMAS, CONSTRUCTIONLINE SSIP ACCREDITED.