Sean Carr supplied and installed an Anaerobic Digestate Storage Concrete Tank and Structural Waterproofing in Devon. It took 2 TWI/CSWIP/IPAF technicians 7 days to install lining internally to the round Anaerobic Digestate Tank, to prevent eroision of the concrete, in addition to the lining supplied and installed of the 8m high concrete tank. A 2mm HDPE liner extrusion was also welded to the embedded stud liner.